South Parking Structure

View of the South Parking Structure at Fremont campus.

The South Parking Structure at Fremont campus.

The first major project to be completed under the Measure G bond is a 900+ space parking structure at the upper campus level.  Students parking in the parking structure can access the campus at three different levels to get to their classes.  The award-winning design embeds the structure into the hillside so it is integrated into the look and feel of the new architecture.  The parking structure opened in August 2015.